Skip to content
Try the map
R&R BUDGETARY ESTIMATOR · SGP-EST · MARKET-BENCHMARKED

Your R&R repainting budget, measured from real data, not guesswork

A free budgetary estimate for your repairs and redecoration project, computed from your buildings' actual geometry and calibrated against real Singapore tender outcomes. Built for managing agents, MCSTs and asset owners.

Select your buildings on the map
Free · No sign-up to try · Details only when you request the document
Years of published tender outcomes analysed Thousands of bid data points behind the benchmarks Every building measured from official geospatial data
01 / WHY THESE NUMBERS CAN BE TRUSTED

Built on the market's own outcomes

Repainting tenders for identical buildings routinely receive bids millions of dollars apart. This tool exists to give asset owners a defensible, data-anchored reference point.

01

Trained on real tender outcomes

Our benchmarks are built on a continuously updated dataset of published Singapore R&R tender results spanning multiple years, covering thousands of individual bids across town council, MCST and commercial projects. We know what winning bids actually look like, not just what contractors quote.

02

Measured, not estimated by eye

Your buildings' paintable wall areas are computed from official geospatial records: mapped building footprints, storey counts and measured perimeters. The same physical building should never produce wildly different quantities, and with measurement it doesn't.

03

Industry-calibrated assumptions

Paint coverage, labour productivity and height-access rates per square metre reflect prevailing Singapore market conditions, from gondola and rope-access premiums to preliminaries and GST, reviewed against live tender data.

NOTE 01 · WHAT THIS TOOL CANNOT SEE Satellite geometry cannot assess facade condition, concealed repairs or access constraints. Where repair scope is significant, the estimate range widens accordingly and the report says so. Every figure is delivered as a range with its assumptions stated. This is a budgetary estimate, not a quotation.
02 / WHAT YOU GET

Days of legwork, replaced

The traditional route to a budgetary figure means calling several contractors, coordinating site show-rounds and waiting days for numbers that often disagree by a wide margin.

01

One submission, no call-downs

No contractor call-downs, no show-round scheduling, no chasing. Submit your project once and receive a structured budgetary estimate by email within 1–2 working days.

02

Budget with confidence

Set sinking fund provisions, sanity-check consultant estimates, and benchmark incoming bids against an independent, data-derived reference before you commit.

03

Board-ready output

Your estimate arrives as a clear document showing the buildings assessed, measured quantities, scope assumptions and a low-to-high budgetary range you can table at your next council or management meeting.

03 / HOW IT WORKS

Map first, details after

Four steps, five minutes of your time.

Select your buildings on the map

Search your postal code and every mapped building outline snaps onto the map, already measured. Tap the ones in scope, or draw one boundary around the whole cluster.

Confirm scope and your details

Tell us where to send the document. Your selection and measured quantities carry straight through.

We verify and compute

Our team checks the submission, runs the measurement and benchmark engines, and prepares your document.

Estimate in your inbox

Within 1–2 working days: measured quantities, assumptions and a budgetary range, with a map of your selected buildings.

04 / COMMON QUESTIONS

Common questions

Is this a formal quotation?

No. It is a budgetary estimate intended for planning, budgeting and benchmarking. Final contract pricing always depends on detailed specifications, site conditions and the repair scope, which vary by project. It is, however, grounded in the same data that shapes real winning bids.

What does it cost?

Nothing. We publish this tool to raise the quality of budgeting information available to Singapore's property managers and asset owners.

Why do you need my details at all?

You can select buildings and see the measured quantities without giving us anything. Details are only needed when you request the estimate document itself: each one is reviewed by a person before release, and your contact details let us deliver it and clarify anything in the submission. We decline requests only where the information provided is false or erroneous.

Does it cover repair works as well as repainting?

The estimate focuses on the repainting scope, with a stated allowance band for repair works. Repair scopes vary enormously between projects; where you have a defined repair schedule, mention it in your submission and we will reflect it.

Which property types are supported?

HDB blocks under town councils, private condominiums and MCST-managed developments, and commercial or industrial buildings anywhere in Singapore.

SEARCH A POSTAL CODE TO BEGIN
1 Select buildings2 Your details3 Review & submit

Where should we send the estimate?

Your 0-building selection and its measured quantities are saved. One minute of details, then the document is prepared, checked by our team and emailed to you.

Please enter your name
Please enter your company
Valid email required
Valid SG number required
Please name the project
6-digit Singapore postal code
1 Select buildings2 Your details3 Review & submit

Review and submit

We'll verify the submission and email your budgetary estimate within 1–2 working days.

Request received

Thank you. Our team will verify your submission and you will receive your budgetary estimate at within 1–2 working days. If anything needs clarifying we'll reach out on the number provided.

Submit another project